Oliver-Front-B|

Oliver Elementary School

Birmingham, AL

Owner: Birmingham City Schools

Size: 65,000 SF

Project Stage: Complete

Project Services: Associate Architect; Surveying; Civil, Mechanical, Plumbing, and Electrical Engineering

Description: A new K-5 school on an existing school site combines two 1950's era neighborhood schools into a facility that offers an expanded educational program.   A two-story classroom wing contains the school office on the ground floor and a media center on the second floor.  The design allows for abundant natural light.  The classroom wing is connected to the multi-purpose building by an enclosed connector.  The multi-purpose building includes a gymnasium with stage and the cafeteria.  The multi-purpose building can be used for after-school functions without having to open the classroom building.

Project Information Sheet (PDF)